🚨🚨
#Bitcoinmining 🇵🇰🇵🇰🚨
$BTC 🚨
Bitcoin Mining Blueprint for Pakistan Government Project
Basic Information
Total Power Allocated: 2000 Megawatts (MW)
Mining Machine Name: Antminer S21 pro
Cost per Machine: Rs: 1,500,000/Machine (excluindo todos os impostos)
Power Consumption per Machine: 15.95 Amps @ 220 Volts
Daily Earning per Machine: $21
Exchange Rate Used: 1 USD = PKR 278
---
Blueprint 1: Machine Count and Power Allocation
Step-by-step Calculation:
Power consumed per machine:
15.95 A × 220 V = 3,510 Watts ou 3.5KWatts
Total available power:
2000 MW = 2,000,000,000 Watts ou 2,000,000KWatts
Total number of machines that can run simultaneously:
2,000,000,000 ÷ 3,510 ≈ 569,800 máquinas
---
Blueprint 2: Payback Period Calculation
Daily earning per machine in PKR:
$21 × 278 = RS: 5,838/renda por máquina por dia
Total income from all machines daily in PKR:
5,838x 569,800= RS: 3,326,492,400 (RS: 3.3B/DIA)
Total income from all machines in USD:
$21 x 569,800 = $11,965,800/dia ($11.9M/dia)
Total BTC mint daily:
Ou $11,965,800 ÷ $110,000 = 108.78 Btc/dia @ taxa atual
Total cost of 569,800 Machines in PKR:
569,890 x 1,500,000= RS: 854,700,000,000 (RS: 854.5B)
Time to recover machine cost:
RS: 1,500,000 ÷ 5,838 ≈ 257 Dias
OU
854.5 ÷ 3.3 = 257 Dias
Result:
Each machine will recover its cost in about 257 days (~8.5 meses).