How to optimally configure different costs for BTE mining:
BTE is calculated at a price of 6u, according to the latest official rules, there is no 10% discount, but the price has dropped. Remember to use the link from Dabai to mine, because Dabai's link still offers a 10% computing power boost.
Here is the link: https://www.bitequal.org/game?refer=LCZAZ2UG
Steps: Copy the link, open the wallet, find, paste the URL, link the wallet and you're good to go.
You need to use a VPN, you cannot use the US or Singapore ones.
1. Plan One: The most basic configuration: free S1, cost approximately 0.03 BNB.
2. Plan Two: Optimal configuration with a cost of 300u, basic capacity 50, can be configured: Basic capacity 1 S1 costs 20u, capacity 28 XS7 costs 138u, capacity 18 X3 costs 84u, total computing power is: 2805vH/s, estimated daily output is 5.6 BTE, payback period is about 8-9 days, and as the price of BTE rises, the payback period will shorten.
3. Plan Three: Optimal configuration with a cost of 1400u, upgrading the room to a capacity of 300 costs 360u, can be configured: Basic capacity 1 S1 costs 20u, 2 units of 55 capacity Gaming configuration cost 780u, total computing power is: 10010vH/s, estimated daily output is 20 BTE, payback period is about 9-10 days, and as the price of BTE rises, the payback period will shorten.
4. Plan Four: Optimal configuration with a cost of 2200u, upgrading the room to a capacity of 300 costs 360u, can be configured: Basic capacity 1 S1 costs 20u, capacity 55 XS9 costs 1200u, capacity 55 Gaming configuration costs 390u, total computing power is: 18810vH/s, estimated daily output is 37 BTE, payback period is about 8-9 days, and as the price of BTE rises, the payback period will shorten.
5. Plan Five: Optimal configuration with a cost of 3700u, upgrading the room to a capacity of 300 costs 360u, can be configured: Basic capacity 1 S1 costs 20u, directly configure capacity 300 4090 costs 3000u, total computing power is 49500vH/s, estimated daily output is 100 BTE, payback period is expected to be 6-7 days, and as the price of BTE rises, the payback period will shorten.
This is the cost and payback period calculated based on a BTE price of 6u, which may vary with fluctuations in total network computing power and price increases, resulting in slightly higher costs or shorter payback periods, but the error will not be too large!
This is also within 24 hours, the first-time miners can only upgrade the room once for the optimal configuration.
1. If the investment cost is between 300-1400u, it is recommended to use Plan Two.
2. If the investment cost is between 1400-2200u, it is recommended to use Plan Three.
3. If the investment cost is between 2200-3700u, it is recommended to use Plan Four.
4. If the investment cost is between 3700-7700u, it is recommended to use Plan Five.
Of course, multiple wallets can be created to diversify funds according to the above plan.
Below is the plan for upgrading the room again after the 24-hour time limit has passed.
1. Plan Six: Optimal configuration with a cost of 7700u, two upgrades to a room capacity of 800 costs 1260u, can be configured: Basic capacity 1 S1 costs 20u, configure 2 units of capacity 300 4090 costs 6000u, total computing power is 99110vH/s, estimated daily output is 198 BTE, payback period is expected to be 7-8 days, and as the price of BTE rises, the payback period will shorten.
2. Plan Seven: Optimal configuration with a cost of 8700u, two upgrades to a room capacity of 800 costs 1260u, can be configured: Basic capacity 1 S1 costs 20u, capacity 700 XS19 costs 6900u, total computing power is 121110vH/s, estimated daily output is 242 BTE, payback period is expected to be 6-7 days, and as the price of BTE rises, the payback period will shorten.
3. Plan Eight: Optimal configuration with a cost of 9200u, two upgrades to a room capacity of 800 costs 1260u, can be configured: Basic capacity 1 S1 costs 20u deleted, configure capacity 700 XS19 costs 6900u, configure capacity 55 Gaming costs 375u, configure capacity 28 XS7 costs 138u, configure capacity 18 X3 costs 84u, total computing power is 128645vH/s, estimated daily output is 257 BTE, payback period is expected to be 7-8 days, and as the price of BTE rises, the payback period will shorten.
This is currently the optimal configuration for the amount of funds invested after the second room upgrade.
1. If the investment cost is between 7700-8700u, it is recommended to use Plan Six.
2. If the investment cost is between 8700-9200u, it is recommended to use Plan Seven.
3. If the investment cost is above 9200u, it is recommended to use Plan Eight.
Of course, multiple wallets can be created to diversify funds according to the above plan.
As for being able to upgrade the room more than three times, consult Dabai. If you have a large amount of funds, it's best to get the largest miner, so mining is faster, payback is faster, and later profits are also quicker.
Dabai has already mined 1500 BTE.
