Playing Alpha for a long time has taught me one thing: it's not just about the trading volume; the core factors are the stability of the project team + cost control + the current rules' benefits.
The new rule lately is: CEX address trading has 4 times the points, which seems like a good window period, but not all coins can benefit from it.
Several that dropped ridiculously today can be directly excluded, and those with fluctuating trends don't need to be considered. The old project $SERAPH is relatively stable, with fixed wear and tear, suitable for stage-based ranking.