The Blast journey:
- March 1st, 2024: $197m TVL
- June 7th, 2025: $2.62b TVL
- June 27th, 2025: $143m TVL
Blasted right to the top and back.
- March 1st, 2024: $197m TVL
- June 7th, 2025: $2.62b TVL
- June 27th, 2025: $143m TVL
Blasted right to the top and back.