🚨🚨 #Bitcoinmining 🇵🇰🇵🇰🚨$BTC 🚨

Bitcoin Mining Blueprint for Pakistan Government Project

Basic Information

Total Power Allocated: 2000 Megawatts (MW)

Mining Machine Name: Antminer S21 pro

Cost per Machine: Rs: 1,500,000/Machine (excluding all tax)

Power Consumption per Machine: 15.95 Amps @ 220 Volts

Daily Earning per Machine: $21

Exchange Rate Used: 1 USD = PKR 278

---

Blueprint 1: Machine Count and Power Allocation

Step-by-step Calculation:

Power consumed per machine:

15.95 A × 220 V = 3,510 Watts or 3.5KWatts

Total available power:

2000 MW = 2,000,000,000 Watts or 2,000,000KWatts

Total number of machines that can run simultaneously:

2,000,000,000 ÷ 3,510 ≈ 569,800 machines

---

Blueprint 2: Payback Period Calculation

Daily earning per machine in PKR:

$21 × 278 = RS: 5,838/Machine income per day

Total income from all machines daily in PKR:

5,838x 569,800= RS: 3,326,492,400 (RS: 3.3B/DAY)

Total income from all machines in USD:

$21 x 569,800 = $11,965,800/day ($11.9M/day)

Total BTC mint daily:

Or $11,965,800 ÷ $110,000 = 108.78 Btc/day @ current rate

Total cost of 569,800 Machines in PKR:

569,890 x 1,500,000= RS: 854,700,000,000 (RS: 854.5B)

Time to recover machine cost:

RS: 1,500,000 ÷ 5,838 ≈ 257 Days

OR

854.5 ÷ 3.3 = 257 Days

Result:

Each machine will recover its cost in about 257 days (~8.5 months).